Installation Operation Service Manual
2015-8-31 · boiler until all piping work is complete, cutting holes in the plastic for access to connections. Remove the bolts attaching the boiler to the crate at the underside of the bottom crating. Lift or slide the boiler off of the bottom crating into position. Be careful not to tip the boiler up on one corner or side, which could cause damage to jacket.
Get Price